BidJudge.com - Projects
info@omaconstruction.com
PO Box 429
Maple Valley WA
98038
206-262-1721
Health Breakdown
Avg Left
20
Success
40
Avg Avg
10
Year Proj
50
2 Year Prior Proj
Qual Based
0
Cash Flow
-40
 
80%
80%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
OMA Construction (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
With **$31.2M** remaining backlog concentrated in 120-month projects, cash inflows will remain modest and predictable but constrained by slow burn rates. Recent 2026 bidding produced **$34.5M** in awards at a **26.7%** success rate, providing limited near-term replenishment.

Medium-term Outlook (6-12 months)
Backlog execution will continue at a measured pace given extended durations, requiring new awards to sustain revenue beyond **$31.2M**. The drop in bid volume from **$228.3M** in 2025 to **$53.4M** in 2026 signals potential revenue pressure unless success rates improve.

Key Risk Period
The primary risk emerges in 9-15 months as the small **$53k** near-complete project concludes and long-duration work fails to generate sufficient cash without accelerated new wins.

Recommendations
Prioritize bids on shorter-duration contracts to improve cash conversion and increase overall bid volume to rebuild backlog above **$50M**. Monitor margins closely, targeting average left on low below **6%**.
 
JOBS LOW
  • Stanwood Marine Drive Culvert Replacement
  • Snohomish County
  • 11/10/26
  • SR 202 Widening Trestle Replacement Phase B
  • Woodinville
  • 8/19/26
  • Water Main Rehab Package 6 North
  • Seattle
  • 8/5/26
  • Airport Station Area Pedestrian Improvement
  • SeaTac
  • 7/2/26
  • Barnacle Creek Culvert Replacement
  • Shoreline
  • 2/17/26
  • Transit Connection Corridor
  • Mountlake Terrace
  • 1/21/26
Bidjudge
JOBS BID
  • 22-26-PW 6th St W / Kirkland Way Sidewalk Improvements
  • Kirkland
  • $2,134,462
  • 11/17/26
  • Stanwood Marine Drive Culvert Replacement
  • Snohomish County
  • $3,692,316
  • 11/10/26
  • 2023 Countywide Safety Spot Improvements RC1816 PW-26-0788SB
  • Snohomish County
  • $1,922,567
  • 11/5/26
  • Pedestrian Crossing Safety Improvements FHWA PW 2025-041
  • Seattle
  • $3,187,407
  • 11/4/26
  • Highland Park Way SW Connection PW 2026-040
  • Seattle
  • $1,541,845
  • 11/4/26
  • 2027 123rd Ave NE Culvert Replacements
  • Snohomish County
  • $6,834,999
  • 11/3/26
  • Main Street Revitalization Phase 2
  • Mountlake Terrace
  • $11,298,710
  • 10/28/26
  • 1st Ave NE Shared Use Path N 120th To N 130th PW 2026-005
  • Seattle
  • $2,921,849
  • 10/28/26
  • Eastrail Central Wilburton Interim Trail
  • King County - WA
  • $988,602
  • 10/28/26
  • Eastrail NE Spring Boulevard Trail Link
  • Bellevue
  • $5,588,630
  • 10/1/26
  • SR 202 Widening Trestle Replacement Phase B
  • Woodinville
  • $15,382,726
  • 8/19/26
  • Water Main Rehab Package 6 North
  • Seattle
  • $5,201,000
  • 8/5/26
  • 16th Avenue S Ditch Decommissioning Stormwater Improvements
  • Des Moines
  • $1,060,005
  • 7/29/26
  • West Seattle Junction Landbank Park
  • Seattle
  • $1,398,016
  • 7/15/26
  • Airport Station Area Pedestrian Improvement
  • SeaTac
  • $25,916,580
  • 7/2/26
  • Whitehorse Trail Improvements MP 0 00 2 63
  • Snohomish County
  • $848,888
  • 6/30/26
  • Renton School Pedestrian Crossing No 2
  • Renton
  • $811,073
  • 6/23/26
  • 120th Avenue NE Roadway Rehabilitation
  • Kirkland
  • $4,192,712
  • 6/18/26
  • Marysville Middle School 49th Drive NE South Grove Street Safe Routes School
  • Marysville
  • $422,013
  • 6/9/26
  • Willows Road Watermain Extension
  • Redmond
  • $1,494,129
  • 6/4/26
  • Boise Creek Mitigation
  • King County - WA
  • $1,399,351
  • 2/26/26
  • 2026 South Machias Road Culvert Replacements
  • Snohomish County
  • $2,517,445
  • 2/24/26
  • 76th Avenue SE Mid Block Crossing ADA Improvements
  • Mercer Island
  • $530,756
  • 2/19/26
  • Barnacle Creek Culvert Replacement
  • Shoreline
  • $1,591,288
  • 2/17/26
  • Queensborough Sewer Rehabilitation
  • Alderwood Water and Wastewater District
  • $4,282,835
  • 2/3/26
  • Transit Connection Corridor
  • Mountlake Terrace
  • $1,771,701
  • 1/21/26
Bidjudge
CASH FLOW
  • Transit Connection Corridor
  • Woodinville
  • $15,382,726
  • 10/18/26
  • 120
  • 30.8%
  • $3,845,682
  • $10,639,719
  • Transit Connection Corridor
  • Seattle
  • $5,201,000
  • 10/04/26
  • 120
  • 42.5%
  • $1,300,250
  • $2,990,575
  • Transit Connection Corridor
  • SeaTac
  • $25,916,580
  • 08/31/26
  • 120
  • 70.8%
  • $6,479,145
  • $7,559,002
  • $11,625,077
  • $24,881,612
Bidjudge