BidJudge.com - Projects
  • CMES
  • 2026
  • 23
  • 6
  • 26.09%
  • $93,124,839
  • 7.30%
  • 9.49%
  • 7.66%
  • $259,933,276
info@cmesinc.com
3475 Austell Rd SW
Marietta GA
30008
770-432-9009
Health Breakdown
Avg Left
-10
Success
40
Avg Avg
10
Year Proj
50
2 Year Prior Proj
Qual Based
0
Cash Flow
-40
 
50%
50%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
CMES (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
CMES enters the period with **$70.8M** remaining backlog from 2026 wins totaling **$91M** at a **27.8%** success rate. Multiple projects bid April–July 2026 are mobilizing, generating gradual revenue drawdowns under 120-month terms. Cash inflows will remain modest due to slow mobilization on long-duration contracts.

Medium-term Outlook (6-12 months)
Backlog execution will continue at a measured pace, with **$70.8M** spread across extended schedules limiting acceleration potential. Sustained bidding at 2026 volumes could replenish the pipeline, but **8.15%** average left on low bids signals ongoing margin compression. Working capital needs will stay elevated through year-end.

Key Risk Period
Extended 120–960 month durations create prolonged exposure to cost overruns and delayed collections beyond 12 months. A reversal of the improved **27.8%** win rate could rapidly deplete the **$70.8M** backlog without new awards.

Recommendations
Target shorter-duration bids to compress cash cycle times and reduce duration risk. Tighten estimating processes to lift margins above the current **8–9%** range. Maintain elevated bid volume in GA to capitalize on the recent success rate gains.
 
JOBS LOW
  • Cooper Road Moon Road Hope Hollow Road Intersection Improvement BL105-26
  • Gwinnett County
  • 8/11/26
  • B3CBA2602311-0 Douglas
  • GDOT
  • 7/17/26
  • SR410 US78 CR 9476 Mountain Industrial Blvd Roadway Improvement
  • Tucker
  • 6/4/26
  • B1CBA2502033-3 DeKalb
  • GDOT
  • 4/17/26
  • B1CBA2601706-0 Habersham
  • GDOT
  • 4/17/26
  • FY 2026 Bridge Barrier
  • Paulding County
  • 3/18/26
Bidjudge
JOBS BID
  • Seven Hills Blvd At Naturewalk Pkwy Roundabout
  • Paulding County
  • $1,340,377
  • 9/25/26
  • 2026 Curtis Parkway Dews Pond Road Phases I II
  • Georgia Procurement Registry
  • $6,778,247
  • 8/24/26
  • 0016351 Barrow
  • GDOT
  • $5,054,828
  • 8/21/26
  • 0017401 Fulton
  • GDOT
  • $2,634,474
  • 8/21/26
  • B2102 Collins Road Little Allatoona Creek
  • Cobb County
  • $2,713,767
  • 8/13/26
  • Cooper Road Moon Road Hope Hollow Road Intersection Improvement BL105-26
  • Gwinnett County
  • $2,122,601
  • 8/11/26
  • Ridge Road South Puckett Road Intersection Improvements
  • Gwinnett County
  • $1,632,655
  • 7/30/26
  • B3CBA2602311-0 Douglas
  • GDOT
  • $16,121,348
  • 7/17/26
  • B1CBA2602360-0 DeKalb
  • GDOT
  • $6,409,667
  • 7/17/26
  • B1CBA2602337-0 Banks
  • GDOT
  • $4,009,454
  • 7/17/26
  • New Hope Road Wylie Road Roundabout
  • Marietta
  • $1,734,987
  • 6/26/26
  • B3CBA2602100-0 Polk
  • GDOT
  • $1,556,877
  • 6/12/26
  • B1CBA2602083-0 Oconee
  • GDOT
  • $2,808,062
  • 6/12/26
  • B3CBA2602105-0 Banks
  • GDOT
  • $1,694,192
  • 6/12/26
  • BL087 26 South Rockbridge Road Pedestrian Improvement
  • Gwinnett County
  • $4,267,310
  • 6/4/26
  • SR410 US78 CR 9476 Mountain Industrial Blvd Roadway Improvement
  • Tucker
  • $8,378,788
  • 6/4/26
  • B1CBA2601372-0 Clarke
  • GDOT
  • $3,865,228
  • 5/15/26
  • B1CBA2601706-0 Habersham
  • GDOT
  • $3,365,160
  • 4/17/26
  • B1CBA2502033-3 DeKalb
  • GDOT
  • $62,374,033
  • 4/17/26
  • B1CBA2601181-0 Henry
  • GDOT
  • $34,382,346
  • 3/20/26
  • FY 2026 Bridge Barrier
  • Paulding County
  • $762,909
  • 3/18/26
  • BL042 26 Miller Road Lilburn Stone Mountain Road Garner Road Pedestrian Improvement
  • Gwinnett County
  • $610,899
  • 3/12/26
  • B3CBA2601360-0 GREENE
  • GDOT
  • $35,021,523
  • 2/20/26
  • B1CBA2601253-0 Gordon
  • GDOT
  • $12,611,565
  • 1/23/26
  • B3CBA2601210-0 Barrow, Gwinnett, Hall
  • GDOT
  • $40,757,343
  • 1/23/26
Bidjudge
CASH FLOW
  • B3CBA2601210-0 Barrow, Gwinnett, Hall
  • GDOT
  • $16,121,348
  • 09/15/26
  • 120
  • 17.5%
  • $4,030,337
  • $13,300,112
  • B3CBA2601210-0 Barrow, Gwinnett, Hall
  • Tucker
  • $8,378,788
  • 08/03/26
  • 120
  • 53.3%
  • $2,094,697
  • $3,910,101
  • B3CBA2601210-0 Barrow, Gwinnett, Hall
  • GDOT
  • $62,374,033
  • 06/16/26
  • 120
  • 93.3%
  • $15,593,508
  • $4,158,269
  • B3CBA2601210-0 Barrow, Gwinnett, Hall
  • GDOT
  • $3,365,160
  • 06/16/26
  • 120
  • 93.3%
  • $841,290
  • $224,344
  • B3CBA2601210-0 Barrow, Gwinnett, Hall
  • GDOT
  • $22,973,379
  • 05/20/25
  • 960
  • 52.5%
  • $717,918
  • $10,912,355
  • $23,277,750
  • $34,627,782
Bidjudge