BidJudge.com - Projects
info@precision2000inc.com
2215 Lawson Way
Atlanta GA
30341
770-455-6000
Health Breakdown
Avg Left
20
Success
30
Avg Avg
10
Year Proj
-30
2 Year Prior Proj
Qual Based
0
Cash Flow
50
 
80%
80%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Precision 2000 P2K (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Precision 2000 P2K enters the period with a modest **$13.3M** remaining backlog from three recently awarded Georgia projects. At a **21.4%** success rate on **$117.8M** in 2026 bids, near-term cash flow will depend on timely mobilization of the **$957K** Cleveland Ave and **$6.1M** DeKalb contracts. Extended 120-month durations limit revenue recognition velocity.

Medium-term Outlook (6-12 months)
The **$6.3M** Bartow/Cherokee/Cobb project and any additional 2026 wins will drive activity, yet the low **4.72%** average left on low bids signals thin margins. Cumulative backlog burn remains slow given multi-year schedules, requiring disciplined overhead control to sustain positive cash flow.

Key Risk Period
The 12- to 18-month window presents the greatest exposure once current backlog is substantially consumed, especially if the **21%** historical win rate does not improve. Prolonged contract durations amplify working-capital strain and delay recovery of mobilization costs.

Recommendations
Prioritize bids that shorten average duration and improve margin retention above the current **4.72%** left-on-low level. Accelerate subcontractor prequalification and cash-flow forecasting to protect liquidity through the low-backlog transition.
 
JOBS LOW
  • IFB CON DOT 2603 1260149 Cleveland Ave Pedestrian Mobility Improvements
  • Atlanta
  • 7/31/26
  • B1CBA2602360-0 DeKalb
  • GDOT
  • 7/17/26
  • B3CBA2601553-0 Bartow/Cherokee/Cobb
  • GDOT
  • 3/20/26
Bidjudge
JOBS BID
  • 0016351 Barrow
  • GDOT
  • $5,876,286
  • 8/21/26
  • 0020167 Brantley
  • GDOT
  • $1,319,498
  • 8/21/26
  • 0017405 Gwinnett
  • GDOT
  • $3,221,937
  • 8/21/26
  • 0017401 Fulton
  • GDOT
  • $3,348,164
  • 8/21/26
  • IFB CON DOT 2603 1260149 Cleveland Ave Pedestrian Mobility Improvements
  • Atlanta
  • $957,514
  • 7/31/26
  • B3CBA2602311-0 Douglas
  • GDOT
  • $16,142,403
  • 7/17/26
  • B1CBA2602360-0 DeKalb
  • GDOT
  • $6,084,113
  • 7/17/26
  • B3CBA2602105-0 Banks
  • GDOT
  • $1,980,102
  • 6/12/26
  • B3CBA2602100-0 Polk
  • GDOT
  • $1,699,967
  • 6/12/26
  • B3CBA2601672-0 Troup
  • GDOT
  • $30,717,577
  • 4/17/26
  • B1CBA2601727-0 Banks
  • GDOT
  • $4,331,686
  • 4/17/26
  • B3CBA2601553-0 Bartow/Cherokee/Cobb
  • GDOT
  • $8,169,376
  • 3/20/26
  • B1CBA2601528-0 Troup
  • GDOT
  • $3,082,340
  • 3/20/26
  • B1CBA2601530-0 Bibb
  • GDOT
  • $7,998,957
  • 3/20/26
  • FY 2026 Bridge Barrier
  • Paulding County
  • $1,170,380
  • 3/18/26
  • B1CBA2601401-0 GREENE/ TALIAFERRO
  • GDOT
  • $11,623,729
  • 2/20/26
  • B1CBA2601406-0 BIBB
  • GDOT
  • $4,666,013
  • 2/20/26
  • B1CBA2601183-0 Cherokee, Pickens
  • GDOT
  • $19,200,812
  • 1/23/26
Bidjudge
CASH FLOW
  • B1CBA2601183-0 Cherokee, Pickens
  • GDOT
  • $8,169,376
  • 05/19/26
  • 365
  • 27.4%
  • $671,456
  • $5,931,191
  • $671,456
  • $12,972,818
Bidjudge