BidJudge.com - Projects
info@baldwinpaving.com
1014 Kenmill Dr NW
Marietta GA
30060
770-429-9911
Health Breakdown
Avg Left
20
Success
-20
Avg Avg
10
Year Proj
-30
2 Year Prior Proj
Qual Based
0
Cash Flow
-40
 
-60%
0%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Baldwin Paving Company (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
The **$8.8M** remaining backlog across four long-duration projects offers modest near-term revenue, with **$3M+** concentrated in the 2026 resurfacing phase. Low 2026 win rates of **11.9%** on **$250M** bids signal potential cash flow gaps unless new awards materialize quickly. Focus on timely billing and collections from active Cobb and Clayton projects to sustain operations.

Medium-term Outlook (6-12 months)
Backlog drawdown will accelerate given extended contract terms and thin **1.38-6.5%** margins on low bids, requiring a step-up from the **4.7%** 2025 success rate. Limited visibility beyond current **$15.9M** annual wins could constrain growth without pipeline conversion.

Key Risk Period
The 6-12 month window presents elevated risk of revenue shortfall as the small backlog depletes amid historically low bidding success.

Recommendations
Tighten bid selection to improve win rates above **12%** and rebuild backlog toward **$20M+**. Accelerate execution on active projects while monitoring GA market opportunities for margin recovery.
 
JOBS LOW
  • B3CBA2602463-0 Cobb
  • GDOT
  • 7/17/26
  • 2026 Resurfacing Phase 3 85708
  • Cherokee County SC
  • 5/8/26
  • B1CBA2601741-0 Clayton
  • GDOT
  • 4/17/26
  • B3CBA2601542-0 Clayton/Fulton
  • GDOT
  • 3/20/26
  • 2026 Resurfacing LMIG
  • Marietta
  • 2/6/26
Bidjudge
JOBS BID
  • LRA Patching Milling Resurfacing Various Douglas County Roads
  • Douglas County
  • $2,638,658
  • 9/21/26
  • B3CBA2602621-0 HALL
  • GDOT
  • $5,866,832
  • 9/18/26
  • B3CBA2602600-0 COBB
  • GDOT
  • $2,289,920
  • 9/18/26
  • B3CBA2602617-0 BARROW
  • GDOT
  • $3,525,858
  • 9/18/26
  • B1CBA2602618-0 CARROLL
  • GDOT
  • $5,624,042
  • 9/18/26
  • FY26 LMIG Resurfacing
  • Sandy Springs
  • $9,097,632
  • 9/18/26
  • Asphalt Resurfacing Multiple Roads
  • Heard County
  • $931,646
  • 9/9/26
  • 2026 Road Resurfacing Program
  • Forsyth County
  • $11,134,677
  • 8/27/26
  • 0017405 Gwinnett
  • GDOT
  • $3,029,447
  • 8/21/26
  • 0017401 Fulton
  • GDOT
  • $2,965,320
  • 8/21/26
  • M006828 Fulton
  • GDOT
  • $2,050,004
  • 8/21/26
  • M006742 Gwinnett
  • GDOT
  • $3,244,756
  • 8/21/26
  • M006920 Gwinnett
  • GDOT
  • $6,103,139
  • 8/21/26
  • 0016351 Barrow
  • GDOT
  • $5,977,026
  • 8/21/26
  • M006182 Hall
  • GDOT
  • $2,236,627
  • 8/21/26
  • B2441 Barrett Parkway Burnt Hickory Road
  • Cobb County
  • $2,188,418
  • 8/13/26
  • B2938 Resurfacing Contract 2026 LMIG LRA Countywide Thoroughfares
  • Cobb County
  • $10,465,046
  • 8/13/26
  • Streer Resurfacing College Park
  • College Park GA
  • $255,063
  • 8/11/26
  • IFB CON DOT 2604 1260182 2025 LMIG Street Resurfacing Associated Activities Group 3
  • Atlanta
  • $3,436,677
  • 8/3/26
  • P I 0020661 SR 166 Chapel Hill Road
  • Douglas County
  • $1,333,413
  • 7/24/26
  • Lakeside Drive Holly Springs Pkwy
  • Cherokee County
  • $213,517
  • 7/21/26
  • B3CBA2602464-0 Fulton
  • GDOT
  • $2,999,309
  • 7/17/26
  • B3CBA2602460-0 Fulton
  • GDOT
  • $6,047,941
  • 7/17/26
  • B3CBA2602463-0 Cobb
  • GDOT
  • $1,552,464
  • 7/17/26
  • B3CBA2602320-0 Cherokee
  • GDOT
  • $69,681,543
  • 7/17/26
  • IFB 500 26 State Route 53 Lumpkin Campground Road Intersection Improvements
  • Dawson County
  • $2,423,573
  • 7/9/26
  • LMIG 2026 Milling Patching Resurfacing
  • Suwanee
  • $1,811,511
  • 7/6/26
  • Wilson Avenue Pedestrian Improvements CDBG
  • Buford
  • $684,612
  • 7/2/26
  • Peachtree Corners Circle Roundabout
  • Peachtree City
  • $1,517,491
  • 6/15/26
  • RFB 2026 02 LMIG Asphalt Resurfacing
  • Holly Springs
  • $530,902
  • 6/5/26
  • Florence Road Hiram Road Gaydon Road
  • Cobb County
  • $947,734
  • 5/28/26
  • FY 2026 LMIG Roadway Resurfacing
  • Berrien County
  • $2,092,956
  • 5/28/26
  • IFB 26 004 Roadway Improvements Various Roads
  • Fairburn
  • $2,195,286
  • 5/22/26
  • B1CBA2601915-0 Fulton
  • GDOT
  • $2,288,149
  • 5/15/26
  • 2026 Roadway Resurfacing Patching Facilities Paving
  • Johns Creek
  • $2,092,956
  • 5/15/26
  • 26 008 2026 Road Resurfacing Improvements
  • Flowery Branch
  • $1,327,643
  • 5/14/26
  • 2026 Resurfacing Phase 3 85708
  • Cherokee County SC
  • $4,402,205
  • 5/8/26
  • Due West SR 92 Realignment
  • Paulding County
  • $3,018,184
  • 5/1/26
  • 2026 LMIG Resurfacing
  • Lawrenceville
  • $1,630,475
  • 4/30/26
  • 2026 01 2026 Resurfacing
  • Lowndes County
  • $5,942,256
  • 4/21/26
  • Patching Milling Resurfacing Various Douglas County Roads
  • Douglas County
  • $3,025,852
  • 4/20/26
  • B1CBA2601737-0 Cobb
  • GDOT
  • $1,839,288
  • 4/17/26
  • B1CBA2601741-0 Clayton
  • GDOT
  • $3,163,702
  • 4/17/26
  • Chapel Hill Road Widening Reconstruction
  • Douglas County
  • $8,759,501
  • 4/17/26
  • 2026 13 2026 LMIG Non LMIG Paving
  • Barrow County
  • $4,072,401
  • 4/9/26
  • 2026 Resurfacing Phase 1 85708
  • Cherokee County
  • $5,942,256
  • 4/6/26
  • 2026 Resurfacing Phase 2 85708
  • Cherokee County
  • $4,715,998
  • 4/6/26
  • FY 2026 Asphalt Resurfacing Contract I
  • Paulding County
  • $7,503,076
  • 3/27/26
  • B3CBA2601542-0 Clayton/Fulton
  • GDOT
  • $3,305,927
  • 3/20/26
  • B1CBA2601181-0 Henry
  • GDOT
  • $35,352,441
  • 3/20/26
  • B1CBA2601539-0 Hall
  • GDOT
  • $2,718,096
  • 3/20/26
  • B3CBA2601364-0 FORSYTH
  • GDOT
  • $605,952
  • 2/20/26
  • B1CBA2601365-0 DOUGLAS
  • GDOT
  • $4,316,916
  • 2/20/26
  • B1CBA2601374-0 BARROW/ OCONEE
  • GDOT
  • $7,780,511
  • 2/20/26
  • 2026 SPLOST Milling Resurfacing Various Streets Districts 1 4
  • Clayton County
  • $9,157,995
  • 2/19/26
  • 2026 Resurfacing LMIG
  • Marietta
  • $3,432,693
  • 2/6/26
  • B1CBA2601265-0 Hall
  • GDOT
  • $7,012,350
  • 1/23/26
  • B1CBA2601212-0 Hall
  • GDOT
  • $1,065,321
  • 1/23/26
  • B1CBA2601183-0 Cherokee, Pickens
  • GDOT
  • $17,286,780
  • 1/23/26
  • East Cherokee Drive Macedonia Elementary School 82130
  • Cherokee County
  • $1,065,987
  • 1/20/26
Bidjudge
CASH FLOW
  • East Cherokee Drive Macedonia Elementary School 82130
  • GDOT
  • $1,552,464
  • 09/15/26
  • 120
  • 10.0%
  • $388,116
  • $1,397,218
  • East Cherokee Drive Macedonia Elementary School 82130
  • Cherokee County SC
  • $4,402,205
  • 07/07/26
  • 120
  • 69.2%
  • $1,100,551
  • $1,357,347
  • East Cherokee Drive Macedonia Elementary School 82130
  • GDOT
  • $3,163,702
  • 06/16/26
  • 120
  • 85.8%
  • $790,926
  • $448,191
  • East Cherokee Drive Macedonia Elementary School 82130
  • GDOT
  • $3,305,927
  • 05/19/26
  • 365
  • 35.9%
  • $271,720
  • $2,119,416
  • $2,551,313
  • $5,322,172
Bidjudge