Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Nelson Construction Moreno & Nelson - OR (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
Nelson Construction holds a thin active backlog of **$6.8M** with projects bid in April and June 2026. Revenue recognition will remain minimal in the near term given the long 120-month durations, constraining cash flow. The 25% success rate on **$53M** in 2026 bids shows modest improvement but insufficient volume to support operations.

Medium-term Outlook (6-12 months)
Execution on the **$7.2M** I-84 interchange project will generate the primary revenue stream, though slow burn rates limit monthly inflows. Sustained bidding momentum is required to offset the **$0** low bids recorded in 2025. Pipeline replenishment remains critical to avoid cash flow gaps.

Key Risk Period
The 12- to 24-month horizon presents the highest risk as the current **$6.8M** backlog depletes without accelerated wins. Extended contract durations heighten exposure to payment delays and cost escalation. Continued low success rates could rapidly erode liquidity.

Recommendations
Target a minimum **$20M** backlog through higher bid volume and refined win strategies. Shift focus toward shorter-duration projects to accelerate cash conversion. Conduct post-bid reviews to lift success rates above 25% and stabilize operations.
 
JOBS LOW
  • I 84 Rieth Interchange Umatilla River Bridges
  • ODOT
  • 6/4/26
  • US26 US395 District 14 MBM 2026
  • ODOT
  • 4/30/26
Bidjudge
JOBS BID
  • PRJ 00116316 28 29 ADA Ramps East 1 Road Fund
  • Washington County - OR
  • $1,117,711
  • 9/23/26
  • 28 29 ADA Ramps East 1 RF 00116316
  • Washington County - OR
  • $1,117,711
  • 9/23/26
  • OR214 Curb Ramps Mt Angel Section
  • ODOT
  • $1,423,423
  • 7/30/26
  • Astoria Cottage Grove Curb Ramps
  • ODOT
  • $9,977,799
  • 7/23/26
  • OR35 White River East Fork Hood River Paving Multiple Locations
  • ODOT
  • $882,288
  • 7/14/26
  • Eastern Oregon 2024 2027 ADA Curb Ramps Phase 3
  • ODOT
  • $4,486,684
  • 6/11/26
  • I 84 Rieth Interchange Umatilla River Bridges
  • ODOT
  • $7,235,235
  • 6/4/26
  • OR47 Curb Ramps Banks
  • ODOT
  • $1,091,190
  • 5/7/26
  • US26 US395 District 14 MBM 2026
  • ODOT
  • $112,700
  • 4/30/26
  • US97 Earl St Colfax Ln Madras Section
  • ODOT
  • $28,148,148
  • 4/2/26
Bidjudge
CASH FLOW
  • US97 Earl St Colfax Ln Madras Section
  • ODOT
  • $7,235,235
  • 08/03/26
  • 120
  • 50.8%
  • $1,808,809
  • $3,557,324
  • US97 Earl St Colfax Ln Madras Section
  • ODOT
  • $112,700
  • 06/29/26
  • 120
  • 80.8%
  • $28,175
  • $21,601
  • $1,836,984
  • $3,578,925