- Carter & Company
- 2026
- 16
- 6
- 37.50%
- $86,011,296
- 5.41%
- 7.86%
- 7.17%
- $157,165,939

With only **$9.3M** total remaining backlog, cash flow depends on steady billings from the two active projects (**$3.85M** and **$5.46M** remaining). The 40% success rate achieved on **$75.6M** in 2026 bids supports near-term replenishment if bidding volume is sustained.
Medium-term Outlook (6-12 months)
The **$37.8M** in 2026 awards provide a modest pipeline, yet the low backlog level signals potential revenue pressure unless additional contracts are secured at similar margins (5.99% avg left on low). Long 120-month durations on current work offer limited near-term acceleration.
Key Risk Period
The 6-12 month window presents the highest exposure, as current backlog exhaustion could create a gap before new awards convert to billings, especially given the drop from 18 bids in 2025 to 10 in 2026.
Recommendations
Prioritize increasing bid volume to **$80M+** annually while targeting shorter-duration projects to rebuild backlog above **$25M**. Monitor award margins closely to protect the 5.99% average left on low.
- US101 Gold Beach Rogue River Bridge
- ODOT
- 9/17/26
- Douglas Ave Deer Creek Bridge Roseburg
- ODOT
- 8/13/26
- Portland Metro Area 2024 2027 ADA Curb Ramps Phase 7
- ODOT
- 6/25/26
- 100343 Century Blvd Extension SE Lois Street E Main Street
- Washington County
- 3/11/26
- I5 N Umpqua R Corp NB SB Bridges Winchester
- ODOT
- 1/15/26
- Cornelius Pass Road Rock Creek Bridge
- ODOT
- 1/8/26
- OR99W Corridor Safety and Intersection Improvements
- ODOT
- $16,736,105
- 11/19/26
- OR99E SE Risley Ave W Arlington St
- ODOT
- $3,815,941
- 10/29/26
- Wolf Creek Lower Grave Creek Rd Bridge
- ODOT
- $1,841,440
- 10/15/26
- OR99 Rogue River Bridge Gold Hill Spur
- ODOT
- $10,941,347
- 9/24/26
- US101 Gold Beach Rogue River Bridge
- ODOT
- $42,964,875
- 9/17/26
- Douglas Ave Deer Creek Bridge Roseburg
- ODOT
- $5,262,084
- 8/13/26
- Portland Metro Area 2024 2027 ADA Curb Ramps Phase 7
- ODOT
- $3,851,649
- 6/25/26
- NB Highland Dr Barnett Rd Section
- ODOT
- $3,057,925
- 6/25/26
- US30BY Curb Ramps Phase 2
- ODOT
- $6,130,730
- 6/11/26
- OR47 Curb Ramps Banks
- ODOT
- $1,010,683
- 5/7/26
- SW 205th Avenue Baseline Quatama Improvements
- Washington County - OR
- $16,049,796
- 3/30/26
- 100343 Century Blvd Extension SE Lois Street E Main Street
- Washington County
- $25,178,349
- 3/11/26
- Polk County OR22 Perrydale Rd Kings Valley Highway Section Willamina
- ODOT
- $8,218,055
- 2/19/26
- Jackson County OR62 Lost Creek Lake Bridge
- ODOT
- $3,352,621
- 2/5/26
- I5 N Umpqua R Corp NB SB Bridges Winchester
- ODOT
- $5,184,949
- 1/15/26
- Cornelius Pass Road Rock Creek Bridge
- ODOT
- $3,569,390
- 1/8/26
- Cornelius Pass Road Rock Creek Bridge
- ODOT
- $42,964,875
- 11/16/26
- 120
- 8.3%
- $10,741,219
- $39,384,469
- Cornelius Pass Road Rock Creek Bridge
- ODOT
- $5,262,084
- 10/12/26
- 120
- 37.5%
- $1,315,521
- $3,288,803
- Cornelius Pass Road Rock Creek Bridge
- ODOT
- $3,851,649
- 08/24/26
- 120
- 78.3%
- $962,912
- $834,524
- $13,019,652
- $43,507,796