BidJudge.com - Projects
5050 36th Ave SE
Salem OR
97317
503-371-4582
Health Breakdown
Avg Left
20
Success
50
Avg Avg
10
Year Proj
50
2 Year Prior Proj
Qual Based
0
Cash Flow
-40
 
90%
90%
Health
Financial Health & Pipeline Brief
Analyzed On:  Aug 13, 2026
Carter & Company (Powered by Grok AI)
Near-term Outlook (next 3-6 months)
With only **$9.3M** total remaining backlog, cash flow depends on steady billings from the two active projects (**$3.85M** and **$5.46M** remaining). The 40% success rate achieved on **$75.6M** in 2026 bids supports near-term replenishment if bidding volume is sustained.

Medium-term Outlook (6-12 months)
The **$37.8M** in 2026 awards provide a modest pipeline, yet the low backlog level signals potential revenue pressure unless additional contracts are secured at similar margins (5.99% avg left on low). Long 120-month durations on current work offer limited near-term acceleration.

Key Risk Period
The 6-12 month window presents the highest exposure, as current backlog exhaustion could create a gap before new awards convert to billings, especially given the drop from 18 bids in 2025 to 10 in 2026.

Recommendations
Prioritize increasing bid volume to **$80M+** annually while targeting shorter-duration projects to rebuild backlog above **$25M**. Monitor award margins closely to protect the 5.99% average left on low.
 
JOBS LOW
  • US101 Gold Beach Rogue River Bridge
  • ODOT
  • 9/17/26
  • Douglas Ave Deer Creek Bridge Roseburg
  • ODOT
  • 8/13/26
  • Portland Metro Area 2024 2027 ADA Curb Ramps Phase 7
  • ODOT
  • 6/25/26
  • 100343 Century Blvd Extension SE Lois Street E Main Street
  • Washington County
  • 3/11/26
  • I5 N Umpqua R Corp NB SB Bridges Winchester
  • ODOT
  • 1/15/26
  • Cornelius Pass Road Rock Creek Bridge
  • ODOT
  • 1/8/26
Bidjudge
JOBS BID
  • OR99W Corridor Safety and Intersection Improvements
  • ODOT
  • $16,736,105
  • 11/19/26
  • OR99E SE Risley Ave W Arlington St
  • ODOT
  • $3,815,941
  • 10/29/26
  • Wolf Creek Lower Grave Creek Rd Bridge
  • ODOT
  • $1,841,440
  • 10/15/26
  • OR99 Rogue River Bridge Gold Hill Spur
  • ODOT
  • $10,941,347
  • 9/24/26
  • US101 Gold Beach Rogue River Bridge
  • ODOT
  • $42,964,875
  • 9/17/26
  • Douglas Ave Deer Creek Bridge Roseburg
  • ODOT
  • $5,262,084
  • 8/13/26
  • Portland Metro Area 2024 2027 ADA Curb Ramps Phase 7
  • ODOT
  • $3,851,649
  • 6/25/26
  • NB Highland Dr Barnett Rd Section
  • ODOT
  • $3,057,925
  • 6/25/26
  • US30BY Curb Ramps Phase 2
  • ODOT
  • $6,130,730
  • 6/11/26
  • OR47 Curb Ramps Banks
  • ODOT
  • $1,010,683
  • 5/7/26
  • SW 205th Avenue Baseline Quatama Improvements
  • Washington County - OR
  • $16,049,796
  • 3/30/26
  • 100343 Century Blvd Extension SE Lois Street E Main Street
  • Washington County
  • $25,178,349
  • 3/11/26
  • Polk County OR22 Perrydale Rd Kings Valley Highway Section Willamina
  • ODOT
  • $8,218,055
  • 2/19/26
  • Jackson County OR62 Lost Creek Lake Bridge
  • ODOT
  • $3,352,621
  • 2/5/26
  • I5 N Umpqua R Corp NB SB Bridges Winchester
  • ODOT
  • $5,184,949
  • 1/15/26
  • Cornelius Pass Road Rock Creek Bridge
  • ODOT
  • $3,569,390
  • 1/8/26
Bidjudge
CASH FLOW
  • Cornelius Pass Road Rock Creek Bridge
  • ODOT
  • $42,964,875
  • 11/16/26
  • 120
  • 8.3%
  • $10,741,219
  • $39,384,469
  • Cornelius Pass Road Rock Creek Bridge
  • ODOT
  • $5,262,084
  • 10/12/26
  • 120
  • 37.5%
  • $1,315,521
  • $3,288,803
  • Cornelius Pass Road Rock Creek Bridge
  • ODOT
  • $3,851,649
  • 08/24/26
  • 120
  • 78.3%
  • $962,912
  • $834,524
  • $13,019,652
  • $43,507,796