- Brown Contracting Oregon
- 2026
- 56
- 11
- 19.64%
- $19,612,508
- 7.58%
- 33.06%
- 10.75%
- $75,391,083

Brown Contracting Oregon holds a **$16.1M** active backlog across eight projects, with major awards such as Astoria Cottage Grove (**$9.0M**) and US30BY Phase 2 (**$6.0M**) driving near-term execution. Recent 2026 bidding produced **$17.2M** in low bids at a 19.5% success rate, supporting steady cash inflows through year-end. Multiple 120-month contracts will pace revenue recognition conservatively over the next two quarters.
Medium-term Outlook (6-12 months)
The improved win rate and higher award volume versus 2025 position the firm for backlog replenishment, though long contract durations limit rapid cash conversion. Sustained Oregon infrastructure bidding should maintain momentum into 2027 if current trends hold. Total remaining backlog of **$16.1M** provides a stable base but requires new wins to avoid drawdown.
Key Risk Period
The 9-15 month window after current backlog burn-off represents the primary risk, as extended 120-month durations delay full collections and expose the firm to bidding variability. Margin pressure could intensify if the 8.63% average left on low does not improve on future awards.
Recommendations
Target higher-margin opportunities to build on the 2026 success rate gains and diversify beyond curb-ramp projects. Implement monthly backlog burn tracking tied to cash flow forecasts to protect liquidity on long-duration contracts.
- BID 2026 62 Pilkington Road SW Dawn Street Enhanced Crossing
- Clackamas County
- 9/16/26
- Buxton Road Pedestrian Improvements
- Multnomah County
- 9/15/26
- US101 Pacific Way Gearhart
- Clatsop
- 8/13/26
- 2026 ITB 16 Patterson Street Safety Pilot E 18th Ave to E 24th Ave
- Eugene
- 8/6/26
- Astoria Cottage Grove Curb Ramps
- ODOT
- 7/23/26
- US30BY Curb Ramps Phase 2
- ODOT
- 6/11/26
- 2026 ITB 7 Old Coburg Road Stormwater Retrofit
- Eugene
- 5/21/26
- OR47 Curb Ramps Banks
- ODOT
- 5/7/26
- 100700 S W Bonita Road SW Sequoia Parkway Intersection Improvements
- Washington County - OR
- 4/22/26
- OR141 SW Hall Blvd Fanmo Creek Trail SW Omara St
- ODOT
- 3/26/26
- East County Pedestrian Improvements Phase 2
- Multnomah County
- 3/11/26
- Beaverton Creek Trail Westside Trail SW Hocken AVE
- ODOT
- $4,567,280
- 9/24/26
- 28 29 ADA Ramps East 1 RF 00116316
- Washington County - OR
- $882,883
- 9/23/26
- PRJ 00116316 28 29 ADA Ramps East 1 Road Fund
- Washington County - OR
- $882,883
- 9/23/26
- OR99W 3rd St 4th St Western Blvd
- ODOT
- $1,623,623
- 9/17/26
- BID 2026 62 Pilkington Road SW Dawn Street Enhanced Crossing
- Clackamas County
- $244,823
- 9/16/26
- Buxton Road Pedestrian Improvements
- Multnomah County
- $447,596
- 9/15/26
- Waverly South 26th Avenue Improvements
- Milwaukie
- $867,858
- 9/15/26
- Central Ave Pedestrian Improvements Sutherlin
- Douglas County - OR
- $194,823
- 9/3/26
- I 82 US730 Freight Congestion Improvements
- Umatilla Municipal Airport
- $1,861,079
- 9/3/26
- Safe Routes School Sidewalk Improvements Bundle IV
- Medford
- $682,300
- 9/2/26
- ITB 20272001 Cuthbert Amphitheater Site Improvements
- Eugene
- $2,762,447
- 9/1/26
- P21205 Mohawk Paving ADA
- Springfield
- $277,361
- 8/27/26
- 2026 ITB 17 Park Forest Dr 28th Ave Stormwater Improvements
- Eugene
- $379,605
- 8/25/26
- Walking Woods Drive New Storm System Pipe Connections
- Lake Oswego
- $269,535
- 8/18/26
- US101 Pacific Way Gearhart
- Clatsop
- $1,686,823
- 8/13/26
- Kerby Entrance Ramp Pavement Repair
- ODOT
- $98,648
- 8/13/26
- 2026 ITB 16 Patterson Street Safety Pilot E 18th Ave to E 24th Ave
- Eugene
- $79,923
- 8/6/26
- All Roads Transportation Safety Wasco County
- ODOT
- $923,023
- 8/6/26
- Astoria Cottage Grove Curb Ramps
- ODOT
- $8,994,023
- 7/23/26
- 2026 50 Leland Beavercreek Intersection Improvements
- Clackamas County
- $247,742
- 7/22/26
- 2025 91 Neighborhood Park Jennings Lodge Campus
- Clackamas County
- $2,223,130
- 7/14/26
- Portland Metro Area 2024 2027 ADA Curb Ramps Phase 7
- ODOT
- $3,998,323
- 6/25/26
- Pilkington Road Pathway
- Lake Oswego
- $354,597
- 6/18/26
- SW Bryant St Sidewalk Repair New Wheelchair Ramps
- Clatskanie
- $188,876
- 6/17/26
- ITB 14 2026 Safe Routes School Awbrey Park Elementary Pedestrian Access
- Eugene
- $106,942
- 6/16/26
- Eastern Oregon 2024 2027 ADA Curb Ramps Phase 3
- ODOT
- $3,923,008
- 6/11/26
- US30BY Curb Ramps Phase 2
- ODOT
- $5,962,523
- 6/11/26
- 26PW01 SE Stephens Paving Curb Ramp Improvements Phase 1
- Roseburg
- $749,396
- 6/3/26
- 2026 ADA Improvements CIP 05 26
- Happy Valley
- $378,423
- 5/28/26
- 2026 ITB 7 Old Coburg Road Stormwater Retrofit
- Eugene
- $88,888
- 5/21/26
- 2026 008 250772 Sidewalk Safety Program
- Corvallis
- $748,823
- 5/19/26
- NE Cleveland Ave SE Stark St NE Burnside
- Gresham
- $3,798,434
- 5/11/26
- NE 223rd Avenue Improvement
- Multnomah County
- $1,509,565
- 5/7/26
- OR47 Curb Ramps Banks
- ODOT
- $888,423
- 5/7/26
- Steve Street Park
- Tigard
- $1,516,716
- 4/28/26
- Lake Oswego Willamette River Greenway Trail
- Lake Oswego
- $1,097,333
- 4/28/26
- Gresham Fairview Trail Phase 4
- Gresham
- $2,361,687
- 4/23/26
- 100700 S W Bonita Road SW Sequoia Parkway Intersection Improvements
- Washington County - OR
- $423,000
- 4/22/26
- 2026 Safe Routes Schools Improvement
- West Linn
- $658,423
- 4/16/26
- 256116 McKay Park Improvements
- Salem
- $1,366,896
- 4/14/26
- McEwan Road New Sidewalk Stormwater Management Facilities
- Lake Oswego
- $632,623
- 4/7/26
- OR141 SW Hall Blvd Fanmo Creek Trail SW Omara St
- ODOT
- $662,366
- 3/26/26
- SW Scholls Ferry Road Sidewalk Improvements SW Laurelwood Avenue SW 77th Avenue
- Washington County - OR
- $1,974,223
- 3/18/26
- 256107 Streetscape Improvements Phase V 2024b
- Salem
- $2,123,423
- 3/17/26
- East County Pedestrian Improvements Phase 2
- Multnomah County
- $134,120
- 3/11/26
- FY23 FY25 Annual Pedestrian Enhancements
- Wilsonville
- $476,390
- 3/3/26
- 11th Street 12th Street Improvements Main Applegate
- Philomath
- $654,038
- 2/25/26
- 100742 SW Kinnaman Road Sidewalk 194th Ct 196th Ave
- Washington County - OR
- $598,891
- 2/25/26
- 36th Street Main Street Commercial Ave
- Springfield
- $939,089
- 2/24/26
- Washington County OR8 Armco Ave Main St A B Row
- ODOT
- $2,092,023
- 2/12/26
- Redfern Ave Drainage Improvements
- Lake Oswego
- $998,389
- 2/3/26
- I205 Columbia River SE 82nd Drive
- ODOT
- $459,823
- 1/22/26
- Driver Feedback Signs Deschutes County
- ODOT
- $524,688
- 1/15/26
- EWEB Concrete ITB 25 213 PW
- Eugene Water & Electric Board
- $1,467,255
- 1/15/26
- 100816 26 27 ADA Ramps 4
- Washington County
- $812,865
- 1/14/26
- OR38 Elkton Marked Crosswalk Edgeview Dr
- ODOT
- $44,888
- 1/7/26
- 100817 26 27 ADA Ramps 5
- Washington County - OR
- $1,361,188
- 1/7/26
- BID 2026 62 Pilkington Road SW Dawn Street Enhanced Crossing
- Clackamas County
- $244,823
- 11/15/26
- 120
- 0%
- -
- $244,823
- Buxton Road Pedestrian Improvements
- Multnomah County
- $447,596
- 11/14/26
- 120
- 0%
- -
- $447,596
- US101 Pacific Way Gearhart
- Clatsop
- $1,686,823
- 10/12/26
- 120
- 0%
- -
- $1,686,823
- 2026 ITB 16 Patterson Street Safety Pilot E 18th Ave to E 24th Ave
- Eugene
- $79,923
- 10/05/26
- 120
- 0%
- -
- $79,923
- 100817 26 27 ADA Ramps 5
- ODOT
- $8,994,023
- 09/21/26
- 120
- 3.3%
- $2,248,506
- $8,694,222
- 100817 26 27 ADA Ramps 5
- ODOT
- $5,962,523
- 08/10/26
- 120
- 38.3%
- $1,490,631
- $3,676,889
- 100817 26 27 ADA Ramps 5
- Eugene
- $88,888
- 07/20/26
- 120
- 55.8%
- $22,222
- $39,259
- 100817 26 27 ADA Ramps 5
- ODOT
- $888,423
- 07/06/26
- 120
- 67.5%
- $222,106
- $288,737
- 100817 26 27 ADA Ramps 5
- Washington County - OR
- $423,000
- 06/21/26
- 120
- 80.0%
- $105,750
- $84,600
- $4,089,215
- $15,242,872