- Brown Contracting Oregon
- 2026
- 36
- 6
- 16.67%
- $8,159,320
- 7.40%
- 39.81%
- 10.86%
- $46,076,558

Brown Contracting holds a **$17.5M** remaining backlog supported by 2026 low bids of **$8.16M** across six projects, including the **$5.96M** US30BY Curb Ramps award. Execution of active contracts with 120-month durations should generate steady cash inflows through late 2026. The 17.1% success rate on 35 bids signals adequate near-term pipeline coverage.
Medium-term Outlook (6-12 months)
Bidding volume declined to 35 jobs in 2026 from 50 in 2025, yielding lower total low-bid volume of **$8.16M** versus **$9.35M** prior year. Sustained 14-17% win rates will be required to replenish backlog before current work tapers. Margin compression at 7.4% average left on low may pressure operating cash flow during this window.
Key Risk Period
The 9-15 month horizon presents the greatest exposure once the **$17.5M** backlog is substantially consumed without accelerated new awards. Prolonged low success rates combined with extended contract durations heighten the potential for revenue gaps and cash flow strain.
Recommendations
Increase bid volume selectively on higher-probability municipal work to lift win rates above 17%. Tighten cost estimating to reduce the 7.4% average left on low and protect margins. Implement monthly backlog burn-rate tracking tied to cash flow forecasts.
- US30BY Curb Ramps Phase 2
- ODOT
- 6/11/26
- 2026 ITB 7 Old Coburg Road Stormwater Retrofit
- Eugene
- 5/21/26
- OR47 Curb Ramps Banks
- ODOT
- 5/7/26
- 100700 S W Bonita Road SW Sequoia Parkway Intersection Improvements
- Washington County - OR
- 4/22/26
- OR141 SW Hall Blvd Fanmo Creek Trail SW Omara St
- ODOT
- 3/26/26
- East County Pedestrian Improvements Phase 2
- Multnomah County
- 3/11/26
- Portland Metro Area 2024 2027 ADA Curb Ramps Phase 7
- ODOT
- $3,998,323
- 6/25/26
- Pilkington Road Pathway
- Lake Oswego
- $354,597
- 6/18/26
- SW Bryant St Sidewalk Repair New Wheelchair Ramps
- Clatskanie
- $188,876
- 6/17/26
- ITB 14 2026 Safe Routes School Awbrey Park Elementary Pedestrian Access
- Eugene
- $106,942
- 6/16/26
- Eastern Oregon 2024 2027 ADA Curb Ramps Phase 3
- ODOT
- $3,923,008
- 6/11/26
- US30BY Curb Ramps Phase 2
- ODOT
- $5,962,523
- 6/11/26
- 26PW01 SE Stephens Paving Curb Ramp Improvements Phase 1
- Roseburg
- $749,396
- 6/3/26
- 2026 ADA Improvements CIP 05 26
- Happy Valley
- $378,423
- 5/28/26
- 2026 ITB 7 Old Coburg Road Stormwater Retrofit
- Eugene
- $88,888
- 5/21/26
- 2026 008 250772 Sidewalk Safety Program
- Corvallis
- $748,823
- 5/19/26
- NE Cleveland Ave SE Stark St NE Burnside
- Gresham
- $3,798,434
- 5/11/26
- NE 223rd Avenue Improvement
- Multnomah County
- $1,509,565
- 5/7/26
- OR47 Curb Ramps Banks
- ODOT
- $888,423
- 5/7/26
- Steve Street Park
- Tigard
- $1,516,716
- 4/28/26
- Lake Oswego Willamette River Greenway Trail
- Lake Oswego
- $1,097,333
- 4/28/26
- Gresham Fairview Trail Phase 4
- Gresham
- $2,361,687
- 4/23/26
- 100700 S W Bonita Road SW Sequoia Parkway Intersection Improvements
- Washington County - OR
- $423,000
- 4/22/26
- 2026 Safe Routes Schools Improvement
- West Linn
- $658,423
- 4/16/26
- 256116 McKay Park Improvements
- Salem
- $1,366,896
- 4/14/26
- McEwan Road New Sidewalk Stormwater Management Facilities
- Lake Oswego
- $632,623
- 4/7/26
- OR141 SW Hall Blvd Fanmo Creek Trail SW Omara St
- ODOT
- $662,366
- 3/26/26
- SW Scholls Ferry Road Sidewalk Improvements SW Laurelwood Avenue SW 77th Avenue
- Washington County - OR
- $1,974,223
- 3/18/26
- 256107 Streetscape Improvements Phase V 2024b
- Salem
- $2,123,423
- 3/17/26
- East County Pedestrian Improvements Phase 2
- Multnomah County
- $134,120
- 3/11/26
- FY23 FY25 Annual Pedestrian Enhancements
- Wilsonville
- $476,390
- 3/3/26
- 11th Street 12th Street Improvements Main Applegate
- Philomath
- $654,038
- 2/25/26
- 100742 SW Kinnaman Road Sidewalk 194th Ct 196th Ave
- Washington County - OR
- $598,891
- 2/25/26
- 36th Street Main Street Commercial Ave
- Springfield
- $939,089
- 2/24/26
- Washington County OR8 Armco Ave Main St A B Row
- ODOT
- $2,092,023
- 2/12/26
- Redfern Ave Drainage Improvements
- Lake Oswego
- $998,389
- 2/3/26
- I205 Columbia River SE 82nd Drive
- ODOT
- $459,823
- 1/22/26
- Driver Feedback Signs Deschutes County
- ODOT
- $524,688
- 1/15/26
- EWEB Concrete ITB 25 213 PW
- Eugene Water & Electric Board
- $1,467,255
- 1/15/26
- 100816 26 27 ADA Ramps 4
- Washington County
- $812,865
- 1/14/26
- OR38 Elkton Marked Crosswalk Edgeview Dr
- ODOT
- $44,888
- 1/7/26
- 100817 26 27 ADA Ramps 5
- Washington County - OR
- $1,361,188
- 1/7/26
- US30BY Curb Ramps Phase 2
- ODOT
- $5,962,523
- 08/10/26
- 120
- 0%
- -
- $5,962,523
- 2026 ITB 7 Old Coburg Road Stormwater Retrofit
- Eugene
- $88,888
- 07/20/26
- 120
- 0%
- -
- $88,888
- 100817 26 27 ADA Ramps 5
- ODOT
- $888,423
- 07/06/26
- 120
- 5.0%
- $222,106
- $844,002
- 100817 26 27 ADA Ramps 5
- Washington County - OR
- $423,000
- 06/21/26
- 120
- 17.5%
- $105,750
- $348,975
- 100817 26 27 ADA Ramps 5
- ODOT
- $662,366
- 05/25/26
- 120
- 40.0%
- $165,592
- $397,420
- 100817 26 27 ADA Ramps 5
- Multnomah County
- $134,120
- 05/10/26
- 120
- 52.5%
- $33,530
- $63,707
- $526,978
- $7,705,515