A Heavy Highway Civil Construction Source
  • Baker Electric
  • 2026
  • 4
  • 1
  • 25.00%
  • $269,800
  • 5.10%
  • 16.47%
  • 16.79%
  • $17,024,857
bakerinfo@baker-electric.com
1298 Pacific Oaks Place
Escondido CA
92029
760-745-2001