A Heavy Highway Civil Construction Source
  • Baker Electric
  • 2025
  • 10
  • 3
  • 30.00%
  • $2,228,525
  • 4.30%
  • 26.80%
  • 10.85%
  • $19,381,686
bakerinfo@baker-electric.com
1298 Pacific Oaks Place
Escondido CA
92029
760-745-2001