A Heavy Highway Civil Construction Source
  • Pavecon - TX
  • 2026
  • 31
  • 1
  • 3.23%
  • $903,125
  • 0.84%
  • 27.16%
  • 7.43%
  • $68,949,890
3022 Roy Orr Blvd.
Grand Prairie TX
75050
972-263-3223
972-263-6551