A Heavy Highway Civil Construction Source
  • Franklin Const.
  • 2025
  • 5
  • 2
  • 40.00%
  • $6,525,041
  • 14.37%
  • 23.74%
  • 24.10%
  • $8,573,276
217 FlumeSt.
Ste. 200
Chico CA
95928
530-343-9600
530-343-4245